Skip to main content
Sidcup Electrical & Building Company logo
[ EV Charger Installation / Crayford ]

EV Charger Installation in Crayford

Sidcup Electrical provides EV charger installation in Crayford. Chris Whyte carries out every job himself, fully insured with public liability cover of £20 million, with free quotes and all work tested and certified.

Sidcup Electrical covers Crayford as part of its 20 mile radius across South East London and Kent, including the streets around Crayford High Street and Crayford railway station. Housing here is typically older terraced houses tied to Crayford's riverside industrial heritage, often with dated wiring. A charge point needs somewhere to park and a suitable supply, so the survey comes first. Chris checks the incoming supply, the consumer unit and the parking position before any price is agreed, and tells you plainly if a charge point is not practical.

What you get in Crayford

  • Tethered or untethered

    Fit the unit that suits how you park and charge, with a straight explanation of the difference.

  • Tested and certified

    The new circuit is tested, certified and labelled, with the paperwork handed over on the day.

  • Board upgrades if needed

    If the existing board cannot take the circuit safely, the options and costs are explained before work starts.

The new circuit is tested and certified to current wiring regulations, with the paperwork handed over on the day. Garages, carports and side walls are all common positions.

The full step by step process is on the EV Charger Installation page.

[ FAQs ]

Crayford FAQs

Yes, general repairs and fault finding, particularly in older terraces with a history of previous fixes, are common work in Crayford.

Yes. Sidcup Electrical installs EV charge points in Crayford and across a 20 mile radius from Sidcup, usually in a single day.

Most homes can take a charge point, but it depends on the incoming supply, the consumer unit and where the car parks. That is exactly what the survey checks before any price is agreed.

A straightforward home installation is usually a single day. Longer cable runs, or a consumer unit that needs work first, can push it into a second day, which is flagged at survey.

Not always. The charge point needs its own protected circuit, so if there is a spare way and the board is in good order it can often be fed from the existing unit.

Tethered means the cable is permanently attached, which is quicker day to day. Untethered keeps the wall unit tidy and works with different cars and cables.

A standard home charge point runs at 7kW, which typically adds a full charge overnight for most cars. The car's own on board charger sets the ceiling.

Yes. Garages, carports and side walls are all common positions, and often make the cable run neater than a front elevation.

Yes. The installation and certification are the same, and the certificate goes to whoever needs it for the property file.

Yes. The new circuit is tested and certified to current wiring regulations, and the paperwork is handed over on the day.

Ready when you are. Call Chris.

07891 438223
Preferred contact method
Call Chris